NEWS
VR

GORVIA Z341R Chemical Anchor Adhesive

August 21, 2025


Specification

Product NameChemical Anchor Adhesive
TypeTwo Components
Mixing Ratio5:1
MaterialEpoxy Resin
Volume360ml
MOQ1000pcs
Packing30pcs/ctn
Shelf Life12 Months
colourRed


Design


Application

Mainly suitable for high-speed rail, bridges, tunnels, building reinforcement and reconstruction, and fixed installation of various basic equipment.Steel structure connecting concrete (concrete) structure,connecting curtain wall pendant, billboard installation, equipment installation and fixation, etc.


Instruction

1. Ensure that the depth and diameter of the drilled holes are in strict accordance with the design, and clean the holes thoroughly using tools such as wire brushes and blowers.

2. temporarily plug the holes with clean lint-free cloth or special plugs to prevent contamination if not immediately injected.

3. Remove rust, grease, galvanized coating, paint, etc. on the length of rebar to be embedded with wire brush/sandpaper to expose the bare metal. Wipe clean with acetone/specialized cleaner to ensure that the rebar is completely dry, free of oil and dust.

4. Install the injectable anchor adhesive on the caulking gun, ensuring that the mixing nozzle is new.

5. Squeeze the gun and discard initially unmixed adhesive.

6. Insert the nozzle tip into the bottom of the hole and steadily inject the adhesive while slowly and evenly withdrawing the nozzle. Fill the hole approximately 2/3 of its volume.

7. Slowly rotate the prepared rebar(usually in a clockwise direction) while fully inserting it into the bottom of the hole before the glue surface drying.

8. A small amount of adhesive extrudes from the hole, indicating that it is adequately filled. Remove any excess extruded adhesive promptly.

9. Wait for the adhesive to cure and do not disturb the rebar(bumping, welding, loading) during this time. Initial inspection is usually available after 24 hours at 23°C, but it will take several days (e.g. 72 hours) to reach full strength. The lower the temperature, the longer the curing time.

10. For critical structures or batch work, on-site pull-out tests (after full cure) should be carried out according to the relevant specifications to verify that the bond strength meets the design requirements.


Caution

1. Keep away from children.

2. Avoid contact of uncured adhesive with skin and eyes. If splashed in the eyes, rinse immediately with plenty of water and seek medical attention.

3. It is recommended to wear protective gear, such as masks, protective gloves, goggles, etc.

4. Wait for the glue to fully cure before proceeding with other processes.

5. The adhesive must be injected from the bottom of the hole.

6. After inserting the rebar, the adhesive should completely fill the hole with a small amount of spillage.

Contact Us
Take advantage of our unrivaled knowledge and experience, we offer you the best customization service.
  • Tel/Wechat
    +0086 17521017986
  • E-mail
    info@gorcci.com
  • Website
    https://gorcci.en.alibaba.com/index.html?spm=a2700.shop_plser.88.13


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

Recommended

Send your inquiry

GET IN TOUCH WITH US

We sincerely invite all interested companies to contact us for more information.

Chat
Now

Send your inquiry

Choose a different language
╳
English
עִברִית
Latin
Deutsch
français
Tiếng Việt
Türkçe
العربية
ภาษาไทย
Português
Українська
русский
Español
Current language:English