GORVIA Z341 is a two-component reinforcing adhesive with 5:1 ratio based on epoxy resin, commonly used for anchoring of steel bars, applicable to high-speed railroads, bridges, tunnels, building reinforcement and renovation, equipment foundations and other projects. It can reinforce the components of concrete structure, steel structure connecting concrete structure, connecting curtain wall hangings, installation and fixing of billboards, equipment etc.

1.GORVIA Z341R 5:1 360ML Chemical Anchor Adhesive Technical Datas:


2.Method of application
a) Array positioning: Positioning according to the design drawings, using the steel detector to avoid the existing steel on the substrate.
b) Mechanical drilling: The depth and diameter of the hole shouldmeet the requirements of the national standard, the hole should be adjusted to avoid the existing steel bar, the actual drilling depth can refer to the 15d benchmark, according to the actual required anchorage force size, and consider the length of the substrate (If the base material is thin, the depth should be reduced), make comprehensive calculation.
c) Clean orifice: After drilling, check whether the hole depth and aperture are qualified, brush the hole wall with a brush after confirming that it is correct, and then blow out the dust in the hole with compressedair. It is recommended to brush three times and blow three times until there is no dust debris in the hole.
d) Cleaning steel bar: Rust, oil on the steel bar should be removed, and polished metal luster, the use of Angle grinder and steel wheel can speed up the process.
e) Glue injection: Install the anchoring epoxy resin adhesive on the groove of the dispenser, install the mixing tip (static mixers for laminar flows) at thefront end, adjust the adhesive injection speed, drain a little of the incomplete colloid before injection, and start from the bottom of the hole to discharge the air, about two-thirds of the hole depth.
f) Insert steel bar: When the steel bar is inserted, it is necessary to turn and insert in a single direction to prevent mixing bubbles and reach the specified depth.
g) Solidification: Planting steel bar has a curing process, before the completecuring shall not disturb the steel bar, if there is a large disturbance should be replanted.
h) Inspection acceptance: After solidification and maintenance of the steel bar can be random sampling, most test with pull out test apparatus.
3.Product Advantages
a) Simple construction, stable formulation and even blending.
b) High strength, fast curing, good durability and thixotropy.
c) Acid and alkali resistance, aging resistance, high seismic performance and weld ability.
4.Storage and transportation
a) Unless otherwise stated, the most ideal way to store this product is tostoreit in an unopened container and place it in a cool and dry place. Theoptimal temperature for storage is 5℃ to 25℃. b) To prevent contamination of unused products, do not return any material to its original container.
c) Transport as non-dangerous goods.